World Class NewsWorld Class News
  • Home
  • News
  • Politics
  • Education
  • Health
  • Entertainment
  • Sports
  • More
    • Crime
    • Environment
    • Feature
    • Metro
    • Religion
  • About Us
    • Contact Us
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
World Class NewsWorld Class News
Subscribe
  • Home
  • News

    2027 Elections: NSCDC Charges Personnel on Neutrality, Professionalism

    October 26, 2026

    ECOWAS Controversy Raises Questions Over Nigeria’s International Appointments

    October 26, 2026

    LAPO Raises Alarm Over 29 Million Nigerian Pupils Without School Drinking Water

    October 22, 2026

    Plateau APC Dismisses Allegations Over N6m Disbursement

    October 22, 2026

    Yobe HoS Sets Up Committee to Investigate Retiree’s Claim

    October 22, 2026
  • Politics

    Taraba 2027: Bayonga Rejects Stepping-Down Rumours, Insists on Governorship Ambition

    October 28, 2026

    NDC candidate blames poor representation for underdevelopment of Taraba North

    October 16, 2026

    Okpebholo Urges APC Campaign Council To Take Party Message To Edo Grassroots

    September 30, 2026

    Agbu Pledges Justice, Fairness in Ibi-Wukari Federal Constituency Representation

    September 25, 2026

    Taraba NDC Tightens Discipline, Warns Members Against Anti-Party Activities

    September 25, 2026
  • Education

    Katsina Disburses N689m Bursary to 19,000 Higher Institution Students

    October 12, 2026

    Fintiri Warns Parents Against Allowing School-Age Children to Roam Streets

    September 29, 2026

    Emir of Gombe Appointed Pioneer Chancellor of Greenland University, Jalingo

    September 26, 2026

    Modibbo Adama University Stops Part-Payment of Undergraduate Registration Fees

    September 24, 2026

    Fresh Crisis Looms as Taraba Varsity ASUU Issues Final Ultimatum

    September 15, 2026
  • Health

    Adamawa to Introduce Mandatory Ebola Screening for Incoming Travellers

    October 26, 2026

    Adamawa Receives Eight Revitalised PHCs from UNICEF

    October 7, 2026

    Diri Links Cancer Burden to Decades of Oil Pollution in Bayelsa

    September 26, 2026

    Plateau Orders Temporary Closure of Schools Over Suspected Diphtheria Cases

    September 5, 2026

    Journalists Challenged To Turn Children’s Budget Promises Into Measurable Results

    September 2, 2026
  • Entertainment

    Zulum Targets Deforestation with Free Gas Cylinders, Refill Vouchers

    July 16, 2026

    TAHRIFF 2025 Spreads Message of Hope at Jalingo Orphanage

    October 20, 2025

    Fintiri Meets Content Creators, Pledges Enhanced Support for Digital Media

    July 31, 2025

    Edo Partners with NBC to Boost Digital Content Creation,  Broadcasting

    February 13, 2025

    Smart City Invests N25 Million in Osun’s Creative Future

    February 6, 2025
  • Sports

    SWAN Insist On Credible NBBF Election

    October 14, 2026

    Arsenal Strengthen EPL Campaign With 2-0 Victory at Sunderland

    September 12, 2026

    Arsenal Edge Chelsea 2-1 in Thrilling London Derby

    September 6, 2026

    NEDC Launches 2026 Skating Championship in Adamawa

    September 5, 2026

    SWAN Demands Urgent Reforms, Greater Role in Nigeria’s Sports Administration

    August 30, 2026
  • More
    1. Crime
    2. Environment
    3. Feature
    4. Metro
    5. Religion
    Featured
    Recent

    NNPCL Pledges to Resume Oil Exploration in Borno, Address Power Plant Delays

    October 28, 2026

    Taraba 2027: Bayonga Rejects Stepping-Down Rumours, Insists on Governorship Ambition

    October 28, 2026

    2027 Elections: NSCDC Charges Personnel on Neutrality, Professionalism

    October 26, 2026
  • About Us
    • Contact Us
World Class NewsWorld Class News
Home » Edo Gov Praises Performing Road Contractors, Warns Against Project Delays
News

Edo Gov Praises Performing Road Contractors, Warns Against Project Delays

WorldClass NewsBy WorldClass NewsJanuary 4, 2026Updated:January 4, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Edo State Governor, Senator Monday Okpebholo, has commended contractors delivering quality work across Edo South Senatorial District, while issuing a stern warning to those lagging behind to improve or risk losing their contracts.

The governor made the remarks during an inspection tour of ongoing road construction projects, aimed at ensuring timely delivery and value for public funds.

Speaking at the tour, Okpebholo said the inspections were necessary to distinguish serious contractors from those failing to meet agreed standards and timelines.

“We visited several sites today, including Church Road and Upper Ekenwan Road. We were not satisfied with the contractor at Church Road. We have advised them to meet the specifications, and if there is no improvement by our next visit, the contract will be revoked,” he warned.

He, however, expressed satisfaction with other projects, praising contractors who demonstrated professionalism and commitment.

“I am very happy with the work at Ogheghe Road and the Sapele Road projects. The contractors handling these sites are doing an excellent job,” he added.

Okpebholo stressed that his administration would not tolerate unnecessary delays, especially with the rainy season approaching, noting that road infrastructure remains a top priority.

“We will continue monitoring these projects closely, even on weekends. With the rainy season almost here, there is no time to waste,” he said.

Linking the projects to President Bola Ahmed Tinubu’s Renewed Hope agenda, the governor noted that road construction is a visible way to restore public confidence in governance.

“When people see these roads, they know we are delivering on our promises and contributing to the President’s Renewed Hope agenda,” he said.

The projects inspected include the 1.4-kilometre Charismatic (Church) Road off Ekhenwa Road by Place of Peace Investment Limited; Old Sapele Road linking Agip, Ohogbohi, and Ogheghe communities, executed by Rawtech Nigeria Limited; Ogheghe Road off Sapele Road by BRASS Engineering and Construction Nigeria Limited; and the Sapele Road Bypass.

Residents of the benefiting communities turned out in large numbers to witness the inspections and praised the governor for the visible and impactful development.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
WorldClass News
  • Website

Related Posts

2027 Elections: NSCDC Charges Personnel on Neutrality, Professionalism

October 26, 2026

ECOWAS Controversy Raises Questions Over Nigeria’s International Appointments

October 26, 2026

LAPO Raises Alarm Over 29 Million Nigerian Pupils Without School Drinking Water

October 22, 2026

Comments are closed.

Recent Posts

  • NNPCL Pledges to Resume Oil Exploration in Borno, Address Power Plant Delays
  • Taraba 2027: Bayonga Rejects Stepping-Down Rumours, Insists on Governorship Ambition
  • 2027 Elections: NSCDC Charges Personnel on Neutrality, Professionalism
  • ECOWAS Controversy Raises Questions Over Nigeria’s International Appointments
  • Troops Foil Kidnapping Attempt, Rescue Two Victims Along Naka Road

Recent Comments

No comments to show.
Facebook X (Twitter) Instagram Pinterest
© 2026 All Rights Reserved, WorldClass News. Designed By DeedsTech.

Type above and press Enter to search. Press Esc to cancel.